Still and Carbonated RTD
Establish recipe, gas / temperature, treatment and package requirements. A shared can or bottle format does not establish the same process duty or cleaning envelope.
Plan ready-to-drink blending, product treatment, recipe changeovers and multi-format filling as an integrated manufacturing investment.
Discuss Your Project

Establish recipe, gas / temperature, treatment and package requirements. A shared can or bottle format does not establish the same process duty or cleaning envelope.
Hydration, stability, allergen transitions and qualified thermal / package routes can differ substantially. Link high-protein formulation projects to the dedicated protein-RTD guide.
Measure campaign lengths, lot changes, setup, cleaning / release and first-good-product time. Define whether the manufacturer earns a conversion fee or sells the complete finished product.
Use product-ready and filler-state evidence to identify lost whole-line availability.
Separate ingredient / recipe setup, qualified cleaning, package setup and quality-release losses.
Define product / treatment / package, supplier responsibilities and all shared infrastructure.
Review each system by its operating duty and the interfaces to be agreed before procurement.
Batching and product-approved buffers.
Recipe and multi-OEM state integration.
Defined customer / SKU cleaning transitions.
Treatment, carbonation and packaging packages.
Swipe horizontally to compare all columns ↔
| System | Operating duty | Relevant DPS guide | Confirm before purchase |
|---|---|---|---|
| Configured tanks / vessels | Batching and product-approved buffers. | DPS tanks & vessels ↗ | Recipe / working-volume and cleaning envelope. |
| Recipe / sequence controls | Recipe and multi-OEM state integration. | Automation & controls ↗ | Identity, interlocks, exceptions and records. |
| CIP equipment and circuit interfaces | Defined customer / SKU cleaning transitions. | DPS CIP systems ↗ | Qualified verification and shared utility peaks. |
| Specialist equipment interfaces | Treatment, carbonation and packaging packages. | Installation & integration ↗ | Qualified route, format and good-output tests. |
Ask for the complete qualified recipe / package envelope, minimum practical campaigns, cleaning responsibilities and package-state tests. Price the infrastructure and integration that make the line commercially usable. A high machine speed with long setup and limited customer demand can give a weaker return than a targeted campaign improvement.
Swipe horizontally to compare all columns ↔
| Buying question | Evidence to prepare | Engineering decision |
|---|---|---|
| Can this line run the next customer SKU? | Ingredients, treatment, package and qualified transition assessment. | Define compatible families and required trials. |
| Is more filling speed useful? | Process-ready, packaging and demand evidence. | Compare usable campaign output, not nameplate alone. |
| Which commercial margin belongs in ROI? | Fee, ownership and variable-cost boundary. | Use consistent contribution / kg and working capital. |
Start with the business outcome
RTD manufacturers and co-packers need repeatable product batches delivered to a qualified package line across short customer campaigns. DPS can connect configured blend / transfer systems, controls, utilities, CIP and specialist treatment / filling interfaces. Investment value depends on commercial utilization, actual changeover losses and contribution after the appropriate product or conversion-fee costs.
RTD describes an intended use and format, not one processing technology. Define alcoholic / nonalcoholic, dairy / nondairy, still / carbonated and chilled / ambient duties separately. Product / preservation and package qualification, specialist fillers and any alcohol-related site scope remain explicitly assigned.
Agree recipe, treatment, gas or temperature duty, package formats and whether the operation earns conversion fees or sells finished product.
Test batch readiness, transfer, specialist treatment and filler handshakes across qualified dairy, nondairy, still or carbonated products in scope.
Check recipe identity, cleaning and release, format setup, first-good-product time and campaign output against qualified customer demand.

Review the scope, cost assumptions and operating case for your project. The examples and calculators below support early planning and are not DPS quotations.
Collect campaign-level batch-ready, cleaning / release and filler-state data. Prioritize interfaces that release useful accepted output before buying a faster package or larger tank.
Define launch customers, qualified product / package range, campaign lengths, treatment route, utilities and complete operating overhead.
Swipe horizontally to compare all columns ↔
| Observed condition | Measure before design | DPS / team decision | Economic basis |
|---|---|---|---|
| Batch-ready filler waits | Matched process and packaging state logs. | Correct the limiting interface or schedule. | Additional good sales capped by demand. |
| Campaign changeover loss | Actual recipe / cleaning / format timeline. | Coordinate controls, circuits and OEM settings. | Useful time plus independent baseline resource savings. |
| Low utilization | Committed demand, qualified SKUs and paid calendar. | Phase scope to realistic customer use. | Contribution on actual sold / billable output. |
| Wrong fee / cost boundary | Material ownership and customer contract basis. | Align finished-product or conversion-only economics. | No mix of conversion fees with customer-owned ingredient expense. |
Swipe horizontally to compare all columns ↔
| Decision | Targeted Work | Broader Scope |
|---|---|---|
| Batch-to-Filler Flow | Correct the measured readiness or transfer interface. | Expand the stage that limits accepted packaged output. |
| Campaign Flexibility | Coordinate recipes, cleaning and existing formats. | Add qualified product or package capability with its full supplier scope. |
| Commercial Use | Improve schedules for committed customer campaigns. | Phase capacity and fixed costs to realistic demand and contract economics. |
Compare proposals with the same product duty, supplier boundaries and acceptance basis. The amount below is a transparent planning example, not a market price range, supplier estimate or DPS quotation.
| Cost bucket | Assumed amount |
|---|---|
| Product / process and interface engineering | $50,000 |
| Defined configured / OEM component allowance | $176,000 |
| Mechanical / electrical field installation | $97,000 |
| Instrumentation and control integration | $50,000 |
| Commissioning and acceptance support | $29,000 |
| Training, documentation and closeout | $18,000 |
| Defined project scope | $420,000 |
| Separate site / facility additions | $60,000 |
| Capital contingency (15%) | $72,000 |
| Separate one-time startup / shutdown cost | $35,000 |
| Incremental working capital | $35,000 |
| Total initial cash | $622,000 |
The defined scope assumes applicable freight, procurement charges and taxes are included in the owner’s estimate. Add missing civil, land / shell, OEM, environmental, validation and permitting costs explicitly. Site and field conditions, duty, production access and quoted supplier scope determine actual price. Financing is excluded.
Hypothetical owner-budget case: 250 days × 0.6 useful recovered hour/day × 1,300 good kg/h × 60% realization gives 117,000 incremental sold kg/year after the 140,000 kg demand ceiling. Net price $3.2/kg less incremental variable cost $1.95/kg gives $1.25/kg contribution. The baseline inputs assume $15,000 energy, $16,000 water / chemistry and $8,000 maintenance reductions per year. Avoided payroll is 400 hours × $38 × 50% cash realization. Verified baseline purchase reduction contributes $0; its basis is unchanged accepted baseline output. Deduct $18,000 added annual fixed cost. Result: $174,850 steady net benefit; initial cash $622,000 includes the separate site, contingency, startup and working-capital inputs. These are original illustrative assumptions, not a quotation, price benchmark or achieved DPS result.
Calculated from these assumptions: steady annual net benefit $174,850; year-one net cash $107,353; cash payback 3.94 years; five-year NPV at 10% is −$20,542. Change the assumptions below to test a different case.
Replace the illustrative inputs with your own measured or quoted values. The five-year pre-tax model uses good kilograms, demand-capped contribution and separately verified baseline savings; it is not a project quotation.
All defaults are illustrative. The default case is an operating-plant improvement, not a greenfield quote. For a new operation, set baseline savings to zero and enter every additional operating and capital cost.
Includes contingency, startup and working capital
Incremental operating cash before tax
Includes year-one ramp assumption
At 10% annual discount
Net annual benefit ÷ initial cash
Net cumulative gain ÷ initial cash
Modeled incremental sales: 117,000 kg/year at $1.25/kg contribution. The base case does not recover the required discounted return within five years. Year-one net cash: $107,353.
Realization needed for the target operating payback
43.7%
Minimum capacity realization for a 5-year operating cash payback; terminal recovery excluded. Demand and unit margin must also hold.
CSV export is local. No inputs are submitted.
Swipe the chart to compare all five years ↔
Swipe horizontally to compare all columns ↔
| Year | Net cash | Cumulative cash | Discounted cash |
|---|---|---|---|
| Initial | −$622,000 | −$622,000 | −$622,000 |
| Year 1 | $107,353 | −$514,648 | $97,593 |
| Year 2 | $174,850 | −$339,798 | $144,504 |
| Year 3 | $174,850 | −$164,947 | $131,367 |
| Year 4 | $174,850 | $9,903 | $119,425 |
| Year 5 | $174,850 | $184,753 | $108,568 |
Swipe horizontally to compare all columns ↔
| Case | Annual benefit | NPV | Cash payback |
|---|---|---|---|
| Downside | $116,350 | −$334,090 | Beyond 5 years |
| Base | $174,850 | −$20,542 | 3.94 years |
| Upside | $213,606 | $114,043 | 3.29 years |
Downside: installed and site costs +20%, realization ×0.75 and unit contribution reduced by 20% of its absolute value. Upside: realization ×1.15, capped at 100%, and unit contribution improved by 10% of its absolute value. The demand ceiling still applies.
The default reproduces the main retrofit energy input of $15,000/year before added maintenance. The narrow worksheet is not a product-process calculation and does not automatically transfer values into the ROI model. Additional annual service is included in the main added-fixed-cost allowance; deduct it once.
Prepare the information below, export the assumptions you have modeled, and discuss the unknowns with DPS. An unmeasured input is a question to resolve, not a reason to invent precision.
Checklist and model data stay in this browser until you choose to share them.

Compare aseptic and hot-fill beverage concepts through product suitability, packaging, hygienic boundaries, utilities and the complete capital scope.

Plan RTD protein beverage manufacturing around formulation, ingredient route, process trials, preservation, packaging and a coordinated factory scope.

Build the product / package envelope, customer commitments, conversion economics, operating costs and launch cash before selecting a flexible RTD line.
Bring your product requirements, operating priorities and site constraints to an initial scope discussion with DPS.