Eight Connected Services. A Scope Built Around Your Project.
Design · Build · Manage
A focused engineering assignment or a coordinated capital project. Connect investment planning, process design, equipment, construction, and startup around the operation you need to build.
Carry engineering knowledge through the project lifecycle. Define the engagement and each party’s role at the outset, including any independent owner-side oversight.
Design
Make the Engineering Basis Clear.
Translate production goals and business assumptions into buildable systems. Connect process, mechanical, controls, electrical, structural, and plumbing requirements before releasing the work.
Capital Planning & Process Design
Equipment, Layouts & Utility Requirements
Controls & Multidiscipline Interfaces
Build
Connect the Work on Site.
Coordinate suppliers, contractors, and installation teams around the agreed design. General contracting is provided within the applicable licensing and local delivery arrangements.
Equipment Supply & Installation
Trade Coordination & Site Sequencing
Utilities, Controls & System Integration
Manage
Carry the Plan Into Operation.
Keep scope, budget, schedule, and decisions connected. Define commissioning, startup, training, and turnover responsibilities so that individual packages become a functioning production system.
Owner’s Representation & Program Management
Risk, Change & Stakeholder Coordination
Commissioning, Startup & Handover
Beverage Production Environment
Food & Beverage Manufacturing
Shared Engineering. Product-Specific Decisions.
Bring the process requirements into every facility decision. DPS works across food and beverage applications, with sanitary design and the applicable regulatory pathway considered within each project’s scope.
Beverages & Fermentation
Brewing, spirits, wine, ready-to-drink products, and the utilities and cleaning systems behind them.
Protein & Prepared Foods
Handling, mixing, cooking, cooling, packaging interfaces, and hygienic production flow.
Dairy, Sauces & Marinades
Product-specific mixing, thermal treatment, material transfer, refrigeration, and sanitation.
Aseptic, Retort & Co-Packing
Preservation requirements, flexible campaigns, specialist equipment, and an integrated facility plan.
Specify the Equipment. Plan Its Place in the System.
DPS-branded equipment and specialist supplier packages need to connect with the product, plant utilities, controls, and cleaning strategy. A defined specification establishes the supply and integration boundaries.
Process & Storage Tanks
Process and storage tank options include reference capacities up to 12,000 gallons. Confirm duty, dimensions, agitation, cleaning requirements, supplier, and availability for the application.
CIP Systems
Cleaning circuits, supply and return conditions, utilities, and automated sequences considered together.
Marination Tumblers
Product loading, vacuum and recipe requirements, handling, and integration with the protein processing line.
Cooking Retorts & Vessels
Thermal duty, product handling, pressure requirements, materials, and applicable documentation established in the equipment specification.
A greenfield beverage co-packing facility was planned with a coordinated scope covering the syrup room, boilers, air compressors, cooling towers, and plant utilities. The engineering plan connected production flexibility with the client’s wider operating and business model.
Greenfield Beverage Co-Packing
Initial Planning Basis
20M Cases / Year
Long-Term Planning Basis
80M Cases / Year
Capacity targets reflect the 2024/2025 planning basis. Confirm current operating capacity and project status for the latest project information.