Site-specific risk and product
Use the responsible team’s actual finding and assessment. Product state, material / personnel routes, storage, equipment and cleaning determine the engineering boundary; generic construction is not a validation method.
Pooling, difficult cleaning, poor service routes or an identified zoning issue requires a site-specific infrastructure change in an operating food plant.

Start with the business outcome
Pooling, difficult cleaning, poor service routes or an identified zoning issue requires a site-specific infrastructure change in an operating food plant. Survey levels, flows, existing underground services, equipment interfaces and the responsible hygiene requirements before pricing drains or floor work. Assess the construction / restart sequence and temporary operating arrangements. DPS can connect the process basis, capital alternatives, field / supplier interfaces, controls and project execution so the owner can make a reviewable investment decision.
This guide organizes engineering around an owner / qualified team’s site-specific hygiene requirements. It does not certify compliance, validate an allergen or microbiological result, prescribe universal design numbers, or promise elimination of risk.

Use the responsible team’s actual finding and assessment. Product state, material / personnel routes, storage, equipment and cleaning determine the engineering boundary; generic construction is not a validation method.
Survey retained floors, drains, underground services, partitions, utility routes and access. Define construction isolation and the operational effects of the change before accepting a simple equipment or civil quote.
Assign inspection, cleaning, testing, product release and supported operating ownership. Cost essential work and compare feasible alternatives without inventing avoided fines, guaranteed risk elimination or automatic extra sales.
Connect the responsible assessment to specific flow, cleanability or infrastructure work.
Use matched requirements, retained conditions and production-continuity needs.
Coordinate live-area protection, construction, inspection, cleaning and agreed release.
Swipe horizontally to compare all columns ↔
| System | Operating duty | Relevant DPS guide | Confirm before purchase |
|---|---|---|---|
| Hygienic process interface | Connect the site finding to product / equipment / cleaning flow. | Hygienic process design ↗ | Qualified assessment and verification responsibility. |
| Site construction | Coordinate trades, retained infrastructure and access. | General contracting ↗ | Civil / structural / local qualified design scope. |
| Installation interfaces | Integrate services, retained equipment and routes. | Installation & integration ↗ | Isolation, testing and operational restart. |
| Owner coordination | Maintain scope, decisions and acceptance accountability. | Owner representation ↗ | Owner / quality / specialist responsibilities. |
Record actual cleaning / process water duty, discharge routes, condition, access and affected product zones. Confirm who assesses materials, civil / structural conditions, drainage capacity and post-work verification.
Swipe horizontally to compare all columns ↔
| Decision area | Operating / site evidence | Acceptance or responsibility |
|---|---|---|
| Drainability evidence | Actual wet areas, water routes and cleaning observations. | Surveyed condition, not a generic floor-slope rule. |
| Underground interfaces | Existing pipe condition, levels, routes and access. | Qualified investigation and cost allowance. |
| Hygienic zoning | Product, people, equipment and service boundaries. | Site-specific owner / quality design basis. |
| Work and restart | Isolation, temporary routes, curing / inspection as applicable. | Agreed production readiness and release. |
Swipe horizontally to compare all columns ↔
| Observed condition | Measure before design | DPS / team decision | Economic basis |
|---|---|---|---|
| Drainability evidence | Actual wet areas, water routes and cleaning observations. | Surveyed condition, not a generic floor-slope rule. | Use the matched product / site baseline and the agreed counterfactual. |
| Underground interfaces | Existing pipe condition, levels, routes and access. | Qualified investigation and cost allowance. | Include complete capital and one-time transition cash. |
| Hygienic zoning | Product, people, equipment and service boundaries. | Site-specific owner / quality design basis. | Count only independent cash costs actually avoided or useful sold output. |
| Work and restart | Isolation, temporary routes, curing / inspection as applicable. | Agreed production readiness and release. | Separate recurring operating benefit from one-time project exposure. |
Survey levels, flows, existing underground services, equipment interfaces and the responsible hygiene requirements before pricing drains or floor work. Assess the construction / restart sequence and temporary operating arrangements.
Record actual cleaning / process water duty, discharge routes, condition, access and affected product zones. Confirm who assesses materials, civil / structural conditions, drainage capacity and post-work verification.
Compare proposals with the same product duty, supplier boundaries and acceptance basis. The amount below is a transparent planning example, not a market price range, supplier estimate or DPS quotation.
| Cost bucket | Assumed amount |
|---|---|
| Survey, measured baseline and engineering | $39,200 |
| Defined equipment / interface components | $89,600 |
| Field mechanical / electrical installation | $70,000 |
| Controls and instrument interfaces | $39,200 |
| Commissioning / qualified test support | $28,000 |
| Training, records and closeout | $14,000 |
| Defined project scope | $280,000 |
| Separate site / facility additions | $160,000 |
| Capital contingency (15%) | $66,000 |
| Separate one-time startup / shutdown cost | $55,000 |
| Incremental working capital | $0 |
| Total initial cash | $561,000 |
The defined scope assumes applicable freight, procurement charges and taxes are included in the owner’s estimate. Add missing civil, land / shell, OEM, environmental, validation and permitting costs explicitly. Site and field conditions, duty, production access and quoted supplier scope determine actual price. Financing is excluded.
Illustrative essential-project comparison: the defined capital scope is $280,000 plus $160,000 site work, 15% capital contingency, $55,000 separate owner transition expense and $0 working capital. Annual output and recurring savings default to zero. The model therefore does not manufacture a payback. Compare feasible execution alternatives in the one-time worksheet; do not enter its result as an annuity.
Calculated from these assumptions: steady annual net benefit $0; year-one net cash $0; cash payback Beyond 5 years; five-year NPV at 10% is −$561,000. Change the assumptions below to test a different case.
Replace the illustrative inputs with your own measured or quoted values. The five-year pre-tax model uses good kilograms, demand-capped contribution and separately verified baseline savings; it is not a project quotation.
This essential-project default costs the defined scope and assumes zero recurring benefit. Compare feasible alternatives and one-time execution exposure. Add annual benefits only when a separately evidenced change in future operating cash exists.
Includes contingency, startup and working capital
Incremental operating cash before tax
Includes year-one ramp assumption
At 10% annual discount
Net annual benefit ÷ initial cash
Net cumulative gain ÷ initial cash
Modeled incremental sales: 0 kg/year at $0.00/kg contribution. The base case does not recover the required discounted return within five years. Year-one net cash: $0.
Realization needed for the target operating payback
Not feasible
Demand, time, contribution or other cash benefits cannot meet the 5-year target under these assumptions.
CSV export is local. No inputs are submitted.
Swipe the chart to compare all five years ↔
Swipe horizontally to compare all columns ↔
| Year | Net cash | Cumulative cash | Discounted cash |
|---|---|---|---|
| Initial | −$561,000 | −$561,000 | −$561,000 |
| Year 1 | $0 | −$561,000 | $0 |
| Year 2 | $0 | −$561,000 | $0 |
| Year 3 | $0 | −$561,000 | $0 |
| Year 4 | $0 | −$561,000 | $0 |
| Year 5 | $0 | −$561,000 | $0 |
Swipe horizontally to compare all columns ↔
| Case | Annual benefit | NPV | Cash payback |
|---|---|---|---|
| Downside | $0 | −$662,200 | Beyond 5 years |
| Base | $0 | −$561,000 | Beyond 5 years |
| Upside | $0 | −$561,000 | Beyond 5 years |
Downside: installed and site costs +20%, realization ×0.75 and unit contribution reduced by 20% of its absolute value. Upside: realization ×1.15, capped at 100%, and unit contribution improved by 10% of its absolute value. The demand ceiling still applies.
Initial cash = (defined project scope + site additions) × (1 + contingency) + separate startup / shutdown cost + working capital. Contingency is conservatively treated as spent initially.
Sold incremental kg = min(days × recovered hours/day × constrained good kg/hour × realization, incremental demand). Contribution = sold incremental kg × (net price − incremental variable cost). New-volume labor, energy and packaging belong in that variable cost.
Baseline material benefit uses the verified percentage of actual purchases avoided at unchanged accepted baseline output. It is not a direct subtraction of two loss rates. Count a recovered kilogram once, either as its applicable cash saving or as incremental contribution.
Net annual benefit = contribution + independently realized baseline cash savings − added fixed operating cost. Year one scales gross benefits by the ramp factor while paying the full added fixed operating cost. Do not also count the same launch loss in the one-time startup amount.
Cash ROI = net annual benefit / initial cash. Five-year net ROI = (five-year cash inflows − initial cash) / initial cash. NPV = −initial cash + Σ cash flow(t)/(1 + discount rate)^t. Payback uses annual cash with linear interpolation within the recovery year. The threshold solver excludes terminal working-capital recovery.
This is a five-year screening horizon, not an asset’s entire life. No tax, debt, depreciation, grants, escalation, asset resale or additional replacement capital is modeled. Include recurring service costs in operating expense and use a detailed monthly budget for formal capital approval.
Both alternatives must satisfy the same qualified project requirements. Compare uncovered lost contribution and the additional execution cost once. Do not count this difference as annual operating savings or assume it eliminates a site risk.
Use representative products, measured constraints and a documented utility / cleaning envelope. Assign each supplier and owner interface.
Plan FAT / SAT, instruments, recipes, permissives, quality checks and upstream / downstream handshakes as appropriate to the scope.
After stabilization, compare matched products and operating conditions. Reconcile extra output with sales, and baseline savings with actual purchases, bills and payroll.

Published scope / project context
DPS publishes food / beverage project, process, utility, installation and controls context. Those materials establish relevant delivery disciplines. None of the amounts, recovered time, energy reductions, schedules or payback in this original screening example is attributed to a customer case.
Swipe horizontally to compare all columns ↔
| Decision | Targeted intervention | Broader replacement / new operation |
|---|---|---|
| Constraint | A measured gap can be corrected within retained assets. | The verified operating envelope cannot meet product, demand or reliability needs. |
| Cost scope | Include engineering, interfaces, shutdown, commissioning and retained-asset risk. | Include all new systems, site / facility work, OEMs, utilities, ramp and working capital. |
| Benefit | Only incremental contribution and genuinely avoided costs versus the current operation. | Demand-supported contribution less the full additional operating cost versus the agreed alternative. |
| Acceptance | Verify the changed duty and its effect on the complete line. | Verify the integrated new train and the owner’s readiness to operate. |
Prepare the information below, export the assumptions you have modeled, and discuss the unknowns with DPS. An unmeasured input is a question to resolve, not a reason to invent precision.
Checklist and model data stay in this browser until you choose to share them.
The DPS manufacturing-scenarios overview and linked service descriptions support engineering / integration context. The site-specific findings, illustrative financial assumptions and decision register on this page require project assessment; they are not published DPS customer results.
Guide assumptions reviewed on 26 October 2026. Qualified site / product teams establish regulatory and food-safety requirements; this guide does not prescribe a validated process.

Plan hygienic zoning around product states, loading, discharge and return routes, using DPS equipment interfaces and a phased room-move case lesson.

Compare central and satellite CIP through circuit routing, pipe inventory, cleaning concurrency, returns and staged connections in a live food plant.

Specify cleaning objects, supply and return duties, product hold-up, controls and connection work before selecting food process equipment and CIP infrastructure.